Short Time Cantilever

Thursday last week I visited Vader, WA with the idea that the cantilever signals there won’t be there much longer.  The nationwide PTC mandate has BNSF replacing signals and upgrading the signal system at quick pace.  While work to stand up replacements hasn’t begun in Vader I’m certain the plans are in place and it will just be a matter of time before it does.

From 4pm to 8:20pm 14 trains passed!  Daytime maintenance held the train traffic up a bit so the early evening time turned quite busy.  At one point the UP local was switching Napavine while 3 northbound trains stacked up from Vader to Napavine South.  Soundbound trains kept rolling but only so the dispatcher could clear a path for Amtrak Cascades trains 508 and 509 could meet more conveniently.

It was a good night to be hanging out with friends and enjoying the activity.